Victory VERSA Reach-In Refrigerators
Current line. 12 model numbers in this series.
Model numbers in this series
Find yours on the data plate. Letters after the base number usually mark the voltage, finish or door and do not change the repair.
- VERSA-1D-GD-HC
- VERSA-1D-HD-HC
- VERSA-1D-HG-HC
- VERSA-1D-SD-HC
- VERSA-2D-GD-HC
- VERSA-2D-HD-HC
- VERSA-2D-HG-HC
- VERSA-2D-SD-HC
- VERSA-3D-GD-HC
- VERSA-3D-HD-HC
- VERSA-3D-HG-HC
- VERSA-3D-SD-HC
Repairs this series usually needs
- Warm cabinet
- Door gasket wear
- Controller alarms
- Probe problems
- Dirty condenser
The VERSA is a Victory reach-in line in one to three sections, with twelve plate numbers such as VERSA-1D-GD-HC, VERSA-1D-HD-HC and VERSA-1D-HG-HC. The letters after the section count describe the door style, such as glass or half door.
The VERSA has its own controller, so we start by reading the display and identifying the alarm words. Then we check the door seals, the condenser and the fans, and the probes. A cabinet with several doors can have a leak in just one, so we test each gasket in turn.
Read us the plate number so we confirm the door style and the parts before we arrive. Where the cabinet has three sections, we test each section’s temperature on its own, because one leaking seal can hide behind two good ones.
About this series
- One- to three-section reach-ins
- Controller as described in the VERSA owner's manual
- Models such as VERSA-1D-GD-HC and VERSA-1D-HD-HC
- 12 model numbers
Victory reach-in refrigerators codes
Other Victory reach-in refrigerators series
ACRS-1D-S1-G-HCACRS-1D-S1-HCACRS-1D-S1-PT-HCACRS-1D-S1-PT-SD-HC→Victory CBR Chef BasesCurrent lineCBR112HCCBR36HCCBR48HCCBR52HCCBR60HCCBR72HCCBR84HCCBR96HC→Victory DRS and DRSA Dual-Temperature Reach-InsCurrent lineDRS(A)-2D-S1-HD-HCDRS(A)-2D-S1-LD-HCDRS(A)-2D-S1-PT-HD-HCDRS(A)-2D-S1-PT-LD-HC→Victory HS, HSA, HIS and HISA Heated Holding CabinetsCurrent lineHIS(A)-1D-1HIS(A)-1D-1-PTHIS(A)-1D-1-PT-XHHIS(A)-1D-1-XHHIS(A)-2D-1HIS(A)-2D-1-PTHIS(A)-2D-1-PT-XHHIS(A)-2D-1-XH+17 more→Victory LSR Low-Profile RefrigeratorsCurrent lineLSR23HCLSR23HC-IQLSR27HCLSR27HC-IQLSR49HCLSR49HC-IQLSR72HC→Victory Older VR and RS-S7 Reach-In Refrigerators2010 eraVR-1VR-2VR-3RS-1D-S7RS-2D-S7RS-3D-S7→Victory RFS and RFSA Refrigerator-Freezer Reach-InsCurrent lineRFS(A)-1D-S1-EW-HD-HCRFS(A)-1D-S1-HD-HCRFS(A)-2D-S1-EW-HCRFS(A)-2D-S1-EW-HD-HCRFS(A)-2D-S1-EW-PT-HCRFS(A)-2D-S1-EW-PT-HD-HCRFS(A)-2D-S1-HCRFS(A)-2D-S1-HD-HC+2 more→Victory RIS and RISA Roll-In RefrigeratorsCurrent lineRIS(A)-1D-S1-G-HCRIS(A)-1D-S1-HCRIS(A)-1D-S1-PT-G-HCRIS(A)-1D-S1-PT-HCRIS(A)-1D-S1-PT-XH-G-HCRIS(A)-1D-S1-PT-XH-HCRIS(A)-1D-S1-XH-G-HCRIS(A)-1D-S1-XH-HC+11 more→Victory RS and RSA Reach-In RefrigeratorsCurrent lineRS(A)-1D-S1-EW-G-HCRS(A)-1D-S1-EW-HCRS(A)-1D-S1-EW-HD-G-HCRS(A)-1D-S1-EW-HD-HCRS(A)-1D-S1-EW-PT-G-HCRS(A)-1D-S1-EW-PT-HCRS(A)-1D-S1-EW-PT-HD-GRS(A)-1D-S1-EW-PT-HD-HC+48 more→Victory VPP and VPPD Pizza Prep TablesCurrent lineVPP119HCVPP46HCVPP60HCVPP67HCVPP72HCVPP93HCVPPD119HC-2VPPD119HC-3+21 more→Victory VSP and VSPD Sandwich and Salad Prep TablesCurrent lineVSP27HC-08VSP27HC-12BVSP36HC-10VSP36HC-15BVSP48HC-12VSP48HC-18BVSP60HC-16VSP60HC-24B+20 more→Victory VUR Undercounter RefrigeratorsCurrent lineVUR119HCVUR27HCVUR32HCVUR36HCVUR46HCVUR48HCVUR60HCVUR67HC+22 more→What do GD and HD mean in the number?
They describe the door style, such as a glass door or a half door. We use them to match gaskets and hinges, so please read us the whole number.
Is the VERSA control different from other Victory controls?
Yes. It follows its own owner's manual, so we identify the alarm words before we diagnose. A message on this cabinet may not mean the same thing on another Victory line.
Can you repair a VERSA with several doors?
Yes. We check each gasket and hinge, since one weak door can warm a section, and we replace only what is worn. We test each section after the repair.
Book repair for your Victory VERSA Reach-In Refrigerators
Tell us the maker, the model number from the data plate and what the unit is doing. We confirm a three-hour arrival window and give you a written price before any work starts.